Benakat Petroleum Energy - Asset Resilience Ratio
Benakat Petroleum Energy (BIPI) has an Asset Resilience Ratio of 16.07% as of March 2026. The Asset Resilience Ratio measures the percentage of a company's total assets that are held in liquid form (cash and short-term investments). This metric indicates how well-positioned the company is to handle unexpected financial challenges, economic downturns, or strategic opportunities without requiring external financing. See Benakat Petroleum Energy (BIPI) working capital ratio to evaluate short-term liquidity relative to the company's equity base.
Liquid Assets
Total Assets
Resilience Assessment
Asset Resilience Ratio Trend (2010–2025)
This chart shows how Benakat Petroleum Energy's Asset Resilience Ratio has changed over time. For the complete balance sheet picture, see Benakat Petroleum Energy balance sheet assets.
Liquid Assets Composition Over Time
This chart breaks down Benakat Petroleum Energy's liquid assets into cash & equivalents and short-term investments, showing how the composition has evolved over time. Explore Benakat Petroleum Energy (BIPI) investment intensity to see how much of total assets are deployed in long-term investments.
Current Liquid Assets Breakdown
| Component | Amount | % of Total Assets |
|---|---|---|
| Cash & Equivalents | Rp0.00 | 0% |
| Short-term Investments | Rp251.45 Million | 16.07% |
| Total Liquid Assets | Rp251.45 Million | 16.07% |
Asset Resilience Insights
- Good Liquidity Position: Benakat Petroleum Energy maintains a healthy 16.07% of assets in liquid form.
- This level provides good financial flexibility while maintaining productive asset deployment.
- The company has significant short-term investments, indicating active treasury management.
Benakat Petroleum Energy Industry Peers by Asset Resilience Ratio
Compare Benakat Petroleum Energy's asset resilience ratio with other companies in the same industry.
| Company | Industry | Asset Resilience Ratio |
|---|---|---|
|
Anhui Expressway Co Ltd
SHG:600012 |
Infrastructure Operations | 0.46% |
|
IRB Infrastructure Developers Limited
NSE:IRB |
Infrastructure Operations | 9.42% |
|
Anhui Expressway Company Limited
F:HU7 |
Infrastructure Operations | 0.46% |
|
Grupo Concesionario del Oeste SA
BA:OEST |
Infrastructure Operations | 5.59% |
|
Gayatri Highways Limited
NSE:GAYAHWS |
Infrastructure Operations | 78.02% |
|
Autopistas del Sol
BA:AUSO |
Infrastructure Operations | 2.58% |
|
Transurban Group
AU:TCL |
Infrastructure Operations | 3.54% |
|
Atlas Arteria
AU:ALX |
Infrastructure Operations | 0.00% |
Annual Asset Resilience Ratio for Benakat Petroleum Energy (2010–2025)
The table below shows the annual Asset Resilience Ratio data for Benakat Petroleum Energy.
| Year | Asset Resilience Ratio (%) | Liquid Assets | Total Assets | Change |
|---|---|---|---|---|
| 2025-12-31 | 15.51% | Rp248.23 Million ≈ $14.55K |
Rp1.60 Billion ≈ $93.79K |
+15.45pp |
| 2024-12-31 | 0.06% | Rp959.89K ≈ $56.25 |
Rp1.69 Billion ≈ $99.04K |
+0.04pp |
| 2023-12-31 | 0.02% | Rp281.75K ≈ $16.51 |
Rp1.76 Billion ≈ $102.98K |
-4.43pp |
| 2022-12-31 | 4.45% | Rp50.28 Million ≈ $2.95K |
Rp1.13 Billion ≈ $66.23K |
+4.38pp |
| 2021-12-31 | 0.07% | Rp670.92K ≈ $39.31 |
Rp953.52 Million ≈ $55.87K |
+13.51pp |
| 2020-12-31 | -13.44% | Rp-180.56 Million ≈ $-10.58K |
Rp1.34 Billion ≈ $78.73K |
-12.86pp |
| 2019-12-31 | -0.58% | Rp-7.23 Million ≈ $-423.41 |
Rp1.25 Billion ≈ $73.45K |
+1.42pp |
| 2018-12-31 | -2.00% | Rp-24.62 Million ≈ $-1.44K |
Rp1.23 Billion ≈ $72.25K |
-- |
| 2017-12-31 | 0.00% | Rp0.00 ≈ $0.00 |
Rp1.32 Billion ≈ $77.23K |
-- |
| 2016-12-31 | 0.10% | Rp1.32 Million ≈ $77.52 |
Rp1.28 Billion ≈ $74.92K |
+6.75pp |
| 2015-12-31 | -6.65% | Rp-95.54 Million ≈ $-5.60K |
Rp1.44 Billion ≈ $84.23K |
+7.72pp |
| 2014-12-31 | -14.37% | Rp-205.29 Million ≈ $-12.03K |
Rp1.43 Billion ≈ $83.72K |
+1.39pp |
| 2013-12-31 | -15.76% | Rp-211.13 Million ≈ $-12.37K |
Rp1.34 Billion ≈ $78.50K |
-15.13pp |
| 2012-12-31 | -0.63% | Rp-2.90 Million ≈ $-170.05 |
Rp463.59 Million ≈ $27.16K |
-4.17pp |
| 2011-12-31 | 3.55% | Rp14.56 Million ≈ $853.31 |
Rp410.73 Million ≈ $24.07K |
-30.14pp |
| 2010-12-31 | 33.69% | Rp173.61 Million ≈ $10.17K |
Rp515.31 Million ≈ $30.20K |
-- |
About Benakat Petroleum Energy
PT Astrindo Nusantara Infrastruktur Tbk, an investment holding company, together with its subsidiaries, operates in coal mining infrastructure in Indonesia. The company operates Coal Mining, Port Services, and Mining services and Others segments. It offers coal-mining facilities, including overland conveyors, coal crushers, coal processing plants, coal stockpiles, and coal handling ports. The com… Read more