Pratama Widya Tbk Pt - Asset Resilience Ratio
Pratama Widya Tbk Pt (PTPW) has an Asset Resilience Ratio of 4.93% as of September 2025. The Asset Resilience Ratio measures the percentage of a company's total assets that are held in liquid form (cash and short-term investments). This metric indicates how well-positioned the company is to handle unexpected financial challenges, economic downturns, or strategic opportunities without requiring external financing.
Liquid Assets
Total Assets
Resilience Assessment
Asset Resilience Ratio Trend (2016–2024)
This chart shows how Pratama Widya Tbk Pt's Asset Resilience Ratio has changed over time. Check Pratama Widya Tbk Pt strategic asset allocation index to assess the company's strategic physical and investment asset allocation.
Liquid Assets Composition Over Time
This chart breaks down Pratama Widya Tbk Pt's liquid assets into cash & equivalents and short-term investments, showing how the composition has evolved over time. For market capitalisation and broader financial context, see market cap of Pratama Widya Tbk Pt.
Current Liquid Assets Breakdown
| Component | Amount | % of Total Assets |
|---|---|---|
| Cash & Equivalents | Rp37.83 Billion | 4.93% |
| Short-term Investments | Rp0.00 | 0% |
| Total Liquid Assets | Rp37.83 Billion | 4.93% |
Asset Resilience Insights
- Limited Liquidity: Pratama Widya Tbk Pt maintains only 4.93% of assets in liquid form.
- This low level may indicate efficient asset utilization but could pose risks during economic downturns.
- The company primarily holds liquidity in cash and equivalents rather than short-term investments.
Pratama Widya Tbk Pt Industry Peers by Asset Resilience Ratio
Compare Pratama Widya Tbk Pt's asset resilience ratio with other companies in the same industry.
| Company | Industry | Asset Resilience Ratio |
|---|---|---|
|
Eiffage SA
PA:FGR |
Engineering & Construction | 0.19% |
|
Guangzhou Metro Design And Research
SHE:003013 |
Engineering & Construction | 0.48% |
|
Cendes Co Ltd Class A
SHE:300492 |
Engineering & Construction | 19.13% |
|
Shanghai Urban Architecture Design Co. Ltd.
SHE:300983 |
Engineering & Construction | 21.51% |
|
Jsti Group
SHE:300284 |
Engineering & Construction | 0.67% |
|
Southern Cross Electrical Engineering Ltd
AU:SXE |
Engineering & Construction | 15.57% |
|
Gansu Engineering Consulting Group Co Ltd
SHE:000779 |
Engineering & Construction | 1.21% |
|
Wuhan Xianglong Power Industry Co Ltd
SHG:600769 |
Engineering & Construction | 35.13% |
Annual Asset Resilience Ratio for Pratama Widya Tbk Pt (2016–2024)
The table below shows the annual Asset Resilience Ratio data for Pratama Widya Tbk Pt.
| Year | Asset Resilience Ratio (%) | Liquid Assets | Total Assets | Change |
|---|---|---|---|---|
| 2024-12-31 | 5.17% | Rp37.83 Billion ≈ $2.22 Million |
Rp731.05 Billion ≈ $42.84 Million |
-1.32pp |
| 2023-12-31 | 6.50% | Rp45.50 Billion ≈ $2.67 Million |
Rp700.20 Billion ≈ $41.03 Million |
-1.46pp |
| 2022-12-31 | 7.96% | Rp46.50 Billion ≈ $2.72 Million |
Rp584.47 Billion ≈ $34.25 Million |
+6.29pp |
| 2021-12-31 | 1.66% | Rp9.00 Billion ≈ $527.36K |
Rp540.85 Billion ≈ $31.69 Million |
-- |
| 2020-12-31 | 0.00% | Rp0.00 ≈ $0.00 |
Rp435.83 Billion ≈ $25.54 Million |
-- |
| 2019-12-31 | 0.58% | Rp2.00 Billion ≈ $117.19K |
Rp345.98 Billion ≈ $20.27 Million |
+0.21pp |
| 2018-12-31 | 0.36% | Rp963.50 Million ≈ $56.46K |
Rp263.98 Billion ≈ $15.47 Million |
-2.54pp |
| 2017-12-31 | 2.90% | Rp3.85 Billion ≈ $225.83K |
Rp132.71 Billion ≈ $7.78 Million |
-- |
| 2016-12-31 | 0.00% | Rp0.00 ≈ $0.00 |
Rp86.67 Billion ≈ $5.08 Million |
-- |
About Pratama Widya Tbk Pt
PT Pratama Widya Tbk provides construction services focusing on geotechnical engineering for private and government sectors in Indonesia. It offers geotechnical investigation; foundation, including bored pile, piling, injection pile, and loading test; retaining wall, such as soldier pile and contiguous pile, sheet pile, secant pile, and diaphragm wall; grouting, jet grouting and deep mixing, and … Read more