Ekovest Bhd Asset Resilience Ratio

Latest as of March 2026: 2.46%

Ekovest Bhd asset resilience ratio. Ekovest Bhd (8877) has an Asset Resilience Ratio of 2.46% as of March 2026. The Asset Resilience Ratio measures the percentage of a company's total assets that are held in liquid form (cash and short-term investments). This metric indicates how well-positioned the company is to handle unexpected financial challenges, economic downturns, or strategic opportunities without requiring external financing. See operational self-sufficiency of Ekovest Bhd to measure how many days the company can operate on defensive assets alone.

Liquid Assets

RM271.62 Million
≈ $68.20 Million USD Cash + Short-term Investments

Total Assets

RM11.03 Billion
≈ $2.77 Billion USD All company assets

Resilience Assessment

Low
Financial Resilience Level

Asset Resilience Ratio of Ekovest Bhd (2012–2025)

Asset resilience ratio of Ekovest Bhd from 2012 to 2025. This chart shows how Ekovest Bhd's Asset Resilience Ratio has changed over time. Read debt load of Ekovest Bhd for a breakdown of total debt and financial obligations.

Liquid Assets Composition Over Time

This chart breaks down Ekovest Bhd's liquid assets into cash & equivalents and short-term investments, showing how the composition has evolved over time. For the complete balance sheet picture, see 8877 asset base.

Current Liquid Assets Breakdown

Component Amount % of Total Assets
Cash & Equivalents RM0.00 0%
Short-term Investments RM271.62 Million 2.46%
Total Liquid Assets RM271.62 Million 2.46%

Asset Resilience Insights

  • Limited Liquidity: Ekovest Bhd maintains only 2.46% of assets in liquid form.
  • This low level may indicate efficient asset utilization but could pose risks during economic downturns.
  • The company has significant short-term investments, indicating active treasury management.

Ekovest Bhd Industry Peers by Asset Resilience Ratio

Compare Ekovest Bhd's asset resilience ratio with other companies in the same industry.

Company Industry Asset Resilience Ratio
SPIE SA
PA:SPIE
Engineering & Construction 0.04%
Bravida Holding AB
ST:BRAV
Engineering & Construction 4.08%
ChengDu Hi-Tech Development Co Ltd
SHE:000628
Engineering & Construction 3.24%
Wuhan East Lake High Technology Group Co Ltd
SHG:600133
Engineering & Construction 0.90%
Hyundai Development Co
KO:294870
Engineering & Construction 1.36%
Shanghai Urban Architecture Design Co. Ltd.
SHE:300983
Engineering & Construction 9.70%
Shenzhen Zhongzhuang Construction Group Co Ltd
SHE:002822
Engineering & Construction 2.29%
Matrix Design Co. Ltd. A
SHE:301365
Engineering & Construction 45.06%

Ekovest Bhd Asset Resilience Ratio by Year (2012–2025)

Ekovest Bhd asset resilience ratio by year from 2012 to 2025. The table below shows the annual Asset Resilience Ratio data for Ekovest Bhd.

Year Asset Resilience Ratio (%) Liquid Assets Total Assets Change
2025-06-30 2.31% RM258.12 Million
≈ $64.81 Million
RM11.16 Billion
≈ $2.80 Billion
-2.47pp
2024-06-30 4.79% RM551.33 Million
≈ $138.42 Million
RM11.52 Billion
≈ $2.89 Billion
-1.69pp
2023-06-30 6.47% RM736.97 Million
≈ $185.03 Million
RM11.39 Billion
≈ $2.86 Billion
-1.13pp
2022-06-30 7.60% RM853.24 Million
≈ $214.22 Million
RM11.23 Billion
≈ $2.82 Billion
-3.29pp
2021-06-30 10.89% RM1.22 Billion
≈ $306.69 Million
RM11.22 Billion
≈ $2.82 Billion
-9.75pp
2020-06-30 20.64% RM2.15 Billion
≈ $540.70 Million
RM10.43 Billion
≈ $2.62 Billion
-7.14pp
2019-06-30 27.78% RM2.97 Billion
≈ $745.85 Million
RM10.69 Billion
≈ $2.68 Billion
-9.56pp
2018-06-30 37.34% RM3.64 Billion
≈ $913.86 Million
RM9.75 Billion
≈ $2.45 Billion
-9.10pp
2017-06-30 46.44% RM4.34 Billion
≈ $1.09 Billion
RM9.35 Billion
≈ $2.35 Billion
+34.69pp
2016-06-30 11.76% RM469.26 Million
≈ $117.82 Million
RM3.99 Billion
≈ $1.00 Billion
-18.59pp
2015-06-30 30.35% RM1.11 Billion
≈ $279.69 Million
RM3.67 Billion
≈ $921.67 Million
-7.51pp
2014-06-30 37.86% RM1.29 Billion
≈ $324.38 Million
RM3.41 Billion
≈ $856.89 Million
+31.68pp
2013-06-30 6.17% RM125.00 Million
≈ $31.38 Million
RM2.02 Billion
≈ $508.41 Million
-1.87pp
2012-06-30 8.04% RM51.00 Million
≈ $12.80 Million
RM634.00 Million
≈ $159.18 Million
--
pp = percentage points

About Ekovest Bhd

KLSE:8877 Malaysia Engineering & Construction
Market Cap
$130.29 Million
RM518.95 Million MYR
Market Cap Rank
#18022 Global
#284 in Malaysia
Share Price
RM0.18
Change (1 day)
+0.00%
52-Week Range
RM0.17 - RM0.35
All Time High
RM1.37
About

Ekovest Berhad, an investment holding company, engages in civil engineering and building works in Malaysia, Indonesia, and the People's Republic of China. It operates through Construction Operations, Property Development, Toll Operations, Plantation, Property Investment, and Other segments. The company is involved in project management for construction works; property development and investment; … Read more