WCE Holdings Bhd - Asset Resilience Ratio

Latest as of September 2025: 4.93%

WCE Holdings Bhd (3565) has an Asset Resilience Ratio of 4.93% as of September 2025. The Asset Resilience Ratio measures the percentage of a company's total assets that are held in liquid form (cash and short-term investments). This metric indicates how well-positioned the company is to handle unexpected financial challenges, economic downturns, or strategic opportunities without requiring external financing.

Liquid Assets

RM417.88 Million
≈ $104.92 Million USD Cash + Short-term Investments

Total Assets

RM8.47 Billion
≈ $2.13 Billion USD All company assets

Resilience Assessment

Low
Financial Resilience Level

Asset Resilience Ratio Trend (2014–2025)

This chart shows how WCE Holdings Bhd's Asset Resilience Ratio has changed over time. Check 3565 PP&E to net assets ratio to assess the company's strategic physical and investment asset allocation.

Liquid Assets Composition Over Time

This chart breaks down WCE Holdings Bhd's liquid assets into cash & equivalents and short-term investments, showing how the composition has evolved over time. For market capitalisation and broader financial context, see WCE Holdings Bhd (3565) market capitalisation.

Current Liquid Assets Breakdown

Component Amount % of Total Assets
Cash & Equivalents RM0.00 0%
Short-term Investments RM417.88 Million 4.93%
Total Liquid Assets RM417.88 Million 4.93%

Asset Resilience Insights

  • Limited Liquidity: WCE Holdings Bhd maintains only 4.93% of assets in liquid form.
  • This low level may indicate efficient asset utilization but could pose risks during economic downturns.
  • The company has significant short-term investments, indicating active treasury management.

WCE Holdings Bhd Industry Peers by Asset Resilience Ratio

Compare WCE Holdings Bhd's asset resilience ratio with other companies in the same industry.

Company Industry Asset Resilience Ratio
Eiffage SA
PA:FGR
Engineering & Construction 0.19%
IES Holdings Inc
NASDAQ:IESC
Engineering & Construction 10.73%
China Railway Construction Corp Ltd
SHG:601186
Engineering & Construction 0.07%
Acter Co Ltd
TWO:5536
Engineering & Construction 2.38%
Shenzhen Sed Industry Co Ltd
SHE:000032
Engineering & Construction 0.33%
China-Singapore Suzhou Industrial Park Development Group Co Ltd
SHG:601512
Engineering & Construction 0.06%
Matrix Design Co. Ltd. A
SHE:301365
Engineering & Construction 45.06%
Shanghai Tongji Science&Technology Industrial Co Ltd
SHG:600846
Engineering & Construction 0.05%

Annual Asset Resilience Ratio for WCE Holdings Bhd (2014–2025)

The table below shows the annual Asset Resilience Ratio data for WCE Holdings Bhd.

Year Asset Resilience Ratio (%) Liquid Assets Total Assets Change
2025-03-31 0.53% RM41.70 Million
≈ $10.47 Million
RM7.93 Billion
≈ $1.99 Billion
-1.62pp
2024-03-31 2.15% RM160.91 Million
≈ $40.40 Million
RM7.48 Billion
≈ $1.88 Billion
-1.03pp
2023-03-31 3.18% RM230.87 Million
≈ $57.96 Million
RM7.25 Billion
≈ $1.82 Billion
+2.72pp
2022-03-31 0.47% RM30.00 Million
≈ $7.53 Million
RM6.44 Billion
≈ $1.62 Billion
-0.11pp
2021-03-31 0.57% RM35.05 Million
≈ $8.80 Million
RM6.13 Billion
≈ $1.54 Billion
-16.91pp
2020-03-31 17.48% RM981.15 Million
≈ $246.34 Million
RM5.61 Billion
≈ $1.41 Billion
-2.18pp
2019-03-31 19.66% RM942.06 Million
≈ $236.52 Million
RM4.79 Billion
≈ $1.20 Billion
-9.00pp
2018-03-31 28.66% RM1.18 Billion
≈ $297.47 Million
RM4.13 Billion
≈ $1.04 Billion
-8.12pp
2017-03-31 36.79% RM1.08 Billion
≈ $271.83 Million
RM2.94 Billion
≈ $738.97 Million
-21.28pp
2016-03-31 58.06% RM1.40 Billion
≈ $352.50 Million
RM2.42 Billion
≈ $607.08 Million
+38.76pp
2014-01-31 19.30% RM94.00 Million
≈ $23.60 Million
RM487.00 Million
≈ $122.27 Million
--
pp = percentage points

About WCE Holdings Bhd

KLSE:3565 Malaysia Engineering & Construction
Market Cap
$546.88 Million
RM2.18 Billion MYR
Market Cap Rank
#11812 Global
#121 in Malaysia
Share Price
RM0.66
Change (1 day)
-0.75%
52-Week Range
RM0.64 - RM0.76
All Time High
RM1.65
About

WCE Holdings Berhad, an investment holding company, engages in the construction, management, and tolling of highway operation in Malaysia. It operates through Toll Concession, Construction, and Others segments. The company designs, develops, and constructs the West Coast Expressway Project, as well as manages its toll operations; and offers construction contracting and project management services… Read more