Muhibbah Engineering M Bhd - Asset Resilience Ratio
Muhibbah Engineering M Bhd (5703) has an Asset Resilience Ratio of 8.15% as of June 2023. The Asset Resilience Ratio measures the percentage of a company's total assets that are held in liquid form (cash and short-term investments). This metric indicates how well-positioned the company is to handle unexpected financial challenges, economic downturns, or strategic opportunities without requiring external financing. See 5703 working capital ratio to evaluate short-term liquidity relative to the company's equity base.
Liquid Assets
Total Assets
Resilience Assessment
Asset Resilience Ratio Trend (2006–2024)
This chart shows how Muhibbah Engineering M Bhd's Asset Resilience Ratio has changed over time. For the complete balance sheet picture, see balance sheet size of Muhibbah Engineering M Bhd.
Liquid Assets Composition Over Time
This chart breaks down Muhibbah Engineering M Bhd's liquid assets into cash & equivalents and short-term investments, showing how the composition has evolved over time. Explore 5703 long-term investment intensity to see how much of total assets are deployed in long-term investments.
Current Liquid Assets Breakdown
| Component | Amount | % of Total Assets |
|---|---|---|
| Cash & Equivalents | RM277.64 Million | 8.15% |
| Short-term Investments | RM0.00 | 0% |
| Total Liquid Assets | RM277.64 Million | 8.15% |
Asset Resilience Insights
- Limited Liquidity: Muhibbah Engineering M Bhd maintains only 8.15% of assets in liquid form.
- This low level may indicate efficient asset utilization but could pose risks during economic downturns.
- The company primarily holds liquidity in cash and equivalents rather than short-term investments.
Muhibbah Engineering M Bhd Industry Peers by Asset Resilience Ratio
Compare Muhibbah Engineering M Bhd's asset resilience ratio with other companies in the same industry.
| Company | Industry | Asset Resilience Ratio |
|---|---|---|
|
ChengDu Hi-Tech Development Co Ltd
SHE:000628 |
Engineering & Construction | 3.24% |
|
Suzhou Gold Mantis Construction Decoration Co Ltd
SHE:002081 |
Engineering & Construction | 2.23% |
|
Matrix Design Co. Ltd. A
SHE:301365 |
Engineering & Construction | 45.06% |
|
Zhejiang Southeast Space Frame Co Ltd
SHE:002135 |
Engineering & Construction | 0.60% |
|
Shenzhen Strongteam Decoration Engineering Co Ltd
SHE:002989 |
Engineering & Construction | 19.94% |
|
M Grass Ecology and Environment Group Co Ltd
SHE:300355 |
Engineering & Construction | 0.78% |
|
Anhui Gourgen Traffic Construction Co Ltd
SHG:603815 |
Engineering & Construction | 0.35% |
|
J.Kumar Infraprojects Limited
NSE:JKIL |
Engineering & Construction | 10.83% |
Annual Asset Resilience Ratio for Muhibbah Engineering M Bhd (2006–2024)
The table below shows the annual Asset Resilience Ratio data for Muhibbah Engineering M Bhd.
| Year | Asset Resilience Ratio (%) | Liquid Assets | Total Assets | Change |
|---|---|---|---|---|
| 2024-12-31 | 10.05% | RM362.58 Million ≈ $91.03 Million |
RM3.61 Billion ≈ $905.75 Million |
+6.18pp |
| 2023-12-31 | 3.87% | RM134.10 Million ≈ $33.67 Million |
RM3.46 Billion ≈ $869.83 Million |
-8.93pp |
| 2022-12-31 | 12.80% | RM426.36 Million ≈ $107.05 Million |
RM3.33 Billion ≈ $836.32 Million |
+5.73pp |
| 2021-12-31 | 7.07% | RM238.43 Million ≈ $59.86 Million |
RM3.37 Billion ≈ $847.16 Million |
-3.59pp |
| 2020-12-31 | 10.65% | RM392.68 Million ≈ $98.59 Million |
RM3.69 Billion ≈ $925.59 Million |
+0.60pp |
| 2019-12-31 | 10.06% | RM394.31 Million ≈ $99.00 Million |
RM3.92 Billion ≈ $984.52 Million |
+2.13pp |
| 2018-12-31 | 7.93% | RM300.55 Million ≈ $75.46 Million |
RM3.79 Billion ≈ $951.96 Million |
-1.99pp |
| 2017-12-31 | 9.92% | RM339.08 Million ≈ $85.13 Million |
RM3.42 Billion ≈ $858.15 Million |
+1.80pp |
| 2016-12-31 | 8.12% | RM333.14 Million ≈ $83.64 Million |
RM4.10 Billion ≈ $1.03 Billion |
+7.84pp |
| 2015-12-31 | 0.28% | RM10.02 Million ≈ $2.52 Million |
RM3.54 Billion ≈ $889.33 Million |
+0.97pp |
| 2014-12-31 | -0.69% | RM-21.46 Million ≈ $-5.39 Million |
RM3.13 Billion ≈ $786.54 Million |
-0.89pp |
| 2013-12-31 | 0.20% | RM5.42 Million ≈ $1.36 Million |
RM2.65 Billion ≈ $665.37 Million |
-3.42pp |
| 2012-12-31 | 3.63% | RM102.83 Million ≈ $25.82 Million |
RM2.83 Billion ≈ $711.51 Million |
+3.65pp |
| 2010-12-31 | -0.02% | RM-532.00K ≈ $-133.57K |
RM2.71 Billion ≈ $680.09 Million |
+1.25pp |
| 2009-12-31 | -1.27% | RM-32.36 Million ≈ $-8.13 Million |
RM2.54 Billion ≈ $638.24 Million |
-0.02pp |
| 2008-12-31 | -1.26% | RM-32.76 Million ≈ $-8.22 Million |
RM2.61 Billion ≈ $655.27 Million |
-1.33pp |
| 2007-12-31 | 0.07% | RM1.26 Million ≈ $315.59K |
RM1.76 Billion ≈ $441.15 Million |
+0.06pp |
| 2006-12-31 | 0.02% | RM234.00K ≈ $58.75K |
RM1.42 Billion ≈ $356.70 Million |
-- |
About Muhibbah Engineering M Bhd
Muhibbah Engineering (M) Bhd., together with its subsidiaries, engages in the marine construction business in Malaysia, Cambodia, Australia, the United States, Denmark, and internationally. It operates through four segments: Infrastructure Construction, Cranes, Marine Shipbuilding and Ship Repair, and Concession. The company constructs petroleum hub and bunkering facilities, oil and gas terminals… Read more