ZECON Bhd Asset Resilience Ratio
ZECON Bhd asset resilience ratio. ZECON Bhd (7028) has an Asset Resilience Ratio of 1.52% as of June 2026. The Asset Resilience Ratio measures the percentage of a company's total assets that are held in liquid form (cash and short-term investments). This metric indicates how well-positioned the company is to handle unexpected financial challenges, economic downturns, or strategic opportunities without requiring external financing. See how many days can ZECON Bhd fund operations to measure how many days the company can operate on defensive assets alone.
Liquid Assets
Total Assets
Resilience Assessment
Asset Resilience Ratio of ZECON Bhd (2012–2026)
Asset resilience ratio of ZECON Bhd from 2012 to 2026. This chart shows how ZECON Bhd's Asset Resilience Ratio has changed over time. Read ZECON Bhd (7028) financial obligations for a breakdown of total debt and financial obligations.
Liquid Assets Composition Over Time
This chart breaks down ZECON Bhd's liquid assets into cash & equivalents and short-term investments, showing how the composition has evolved over time. For the complete balance sheet picture, see 7028 current and non-current assets.
Current Liquid Assets Breakdown
| Component | Amount | % of Total Assets |
|---|---|---|
| Cash & Equivalents | RM0.00 | 0% |
| Short-term Investments | RM25.98 Million | 1.52% |
| Total Liquid Assets | RM25.98 Million | 1.52% |
Asset Resilience Insights
- Limited Liquidity: ZECON Bhd maintains only 1.52% of assets in liquid form.
- This low level may indicate efficient asset utilization but could pose risks during economic downturns.
- The company has significant short-term investments, indicating active treasury management.
ZECON Bhd Industry Peers by Asset Resilience Ratio
Compare ZECON Bhd's asset resilience ratio with other companies in the same industry.
| Company | Industry | Asset Resilience Ratio |
|---|---|---|
|
SPIE SA
PA:SPIE |
Engineering & Construction | 0.04% |
|
Bravida Holding AB
ST:BRAV |
Engineering & Construction | 4.08% |
|
ChengDu Hi-Tech Development Co Ltd
SHE:000628 |
Engineering & Construction | 3.24% |
|
Wuhan East Lake High Technology Group Co Ltd
SHG:600133 |
Engineering & Construction | 0.90% |
|
Hyundai Development Co
KO:294870 |
Engineering & Construction | 1.36% |
|
Shanghai Urban Architecture Design Co. Ltd.
SHE:300983 |
Engineering & Construction | 9.70% |
|
Shenzhen Zhongzhuang Construction Group Co Ltd
SHE:002822 |
Engineering & Construction | 2.29% |
|
Matrix Design Co. Ltd. A
SHE:301365 |
Engineering & Construction | 45.06% |
ZECON Bhd Asset Resilience Ratio by Year (2012–2026)
ZECON Bhd asset resilience ratio by year from 2012 to 2026. The table below shows the annual Asset Resilience Ratio data for ZECON Bhd.
| Year | Asset Resilience Ratio (%) | Liquid Assets | Total Assets | Change |
|---|---|---|---|---|
| 2026-06-30 | 0.01% | RM104.21K ≈ $26.16K |
RM1.73 Billion ≈ $433.67 Million |
-1.52pp |
| 2025-06-30 | 1.53% | RM25.35 Million ≈ $6.36 Million |
RM1.66 Billion ≈ $416.26 Million |
+1.06pp |
| 2024-06-30 | 0.47% | RM7.35 Million ≈ $1.85 Million |
RM1.56 Billion ≈ $391.56 Million |
-0.03pp |
| 2023-06-30 | 0.50% | RM7.89 Million ≈ $1.98 Million |
RM1.58 Billion ≈ $397.88 Million |
+0.09pp |
| 2022-06-30 | 0.40% | RM6.89 Million ≈ $1.73 Million |
RM1.71 Billion ≈ $428.22 Million |
-0.03pp |
| 2020-06-30 | 0.43% | RM6.88 Million ≈ $1.73 Million |
RM1.60 Billion ≈ $402.22 Million |
-0.10pp |
| 2019-06-30 | 0.53% | RM7.26 Million ≈ $1.82 Million |
RM1.37 Billion ≈ $345.05 Million |
-1.67pp |
| 2018-06-30 | 2.20% | RM26.50 Million ≈ $6.65 Million |
RM1.21 Billion ≈ $302.93 Million |
-0.70pp |
| 2017-06-30 | 2.90% | RM24.75 Million ≈ $6.21 Million |
RM853.42 Million ≈ $214.26 Million |
-5.61pp |
| 2016-06-30 | 8.51% | RM68.61 Million ≈ $17.22 Million |
RM806.30 Million ≈ $202.44 Million |
+7.98pp |
| 2015-06-30 | 0.52% | RM2.00 Million ≈ $502.13K |
RM381.00 Million ≈ $95.66 Million |
-0.65pp |
| 2014-06-30 | 1.17% | RM4.00 Million ≈ $1.00 Million |
RM341.00 Million ≈ $85.61 Million |
-8.08pp |
| 2012-12-31 | 9.25% | RM37.00 Million ≈ $9.29 Million |
RM400.00 Million ≈ $100.43 Million |
-- |
About ZECON Bhd
Zecon Berhad engages in the foundation engineering, civil engineering, building contracting, and related activities in Malaysia. It operates through seven segments: Construction, Property Development, Service Concession, Property Holding, Renewable Energy, Hotel Operations, Car Park Management, and Other. The company also offers piling works; and construct, operate, and maintenance of hospital. I… Read more