Enerside Energy S.A. - Asset Resilience Ratio

Latest as of December 2025: 1.51%

Enerside Energy S.A. (ENRS) has an Asset Resilience Ratio of 1.51% as of December 2025. The Asset Resilience Ratio measures the percentage of a company's total assets that are held in liquid form (cash and short-term investments). This metric indicates how well-positioned the company is to handle unexpected financial challenges, economic downturns, or strategic opportunities without requiring external financing. Check ENRS strategic assets to equity ratio to assess the company's strategic physical and investment asset allocation.

Liquid Assets

€1.31 Million
≈ $1.53 Million USD Cash + Short-term Investments

Total Assets

€86.95 Million
≈ $101.65 Million USD All company assets

Resilience Assessment

Low
Financial Resilience Level

Asset Resilience Ratio Trend (2018–2025)

This chart shows how Enerside Energy S.A.'s Asset Resilience Ratio has changed over time. See Enerside Energy S.A. net asset quality index to measure how much of total assets are equity-financed.

Liquid Assets Composition Over Time

This chart breaks down Enerside Energy S.A.'s liquid assets into cash & equivalents and short-term investments, showing how the composition has evolved over time. For market capitalisation and broader financial context, see market cap of Enerside Energy S.A..

Current Liquid Assets Breakdown

Component Amount % of Total Assets
Cash & Equivalents €0.00 0%
Short-term Investments €1.31 Million 1.51%
Total Liquid Assets €1.31 Million 1.51%

Asset Resilience Insights

  • Limited Liquidity: Enerside Energy S.A. maintains only 1.51% of assets in liquid form.
  • This low level may indicate efficient asset utilization but could pose risks during economic downturns.
  • The company has significant short-term investments, indicating active treasury management.

Enerside Energy S.A. Industry Peers by Asset Resilience Ratio

Compare Enerside Energy S.A.'s asset resilience ratio with other companies in the same industry.

Company Industry Asset Resilience Ratio
Api Group Corp
NYSE:APG
Engineering & Construction 10.21%
Hyundai Development Co
KO:294870
Engineering & Construction 1.07%
Shenzhen Strongteam Decoration Engineering Co Ltd
SHE:002989
Engineering & Construction 19.94%
Shanghai Chengdi Constr Co
SHG:603887
Engineering & Construction 0.39%
Matrix Design Co. Ltd. A
SHE:301365
Engineering & Construction 45.06%
Beijing SPC Environment Protection Tech Co Ltd
SHE:002573
Engineering & Construction 0.23%
Daqian Ecology & Landscape Co Ltd
SHG:603955
Engineering & Construction 0.51%
Shenzhen Magic Design & Decoration Engineering Co Ltd
SHE:002856
Engineering & Construction 0.21%

Annual Asset Resilience Ratio for Enerside Energy S.A. (2018–2025)

The table below shows the annual Asset Resilience Ratio data for Enerside Energy S.A..

Year Asset Resilience Ratio (%) Liquid Assets Total Assets Change
2025-12-31 1.51% €1.31 Million
≈ $1.53 Million
€86.95 Million
≈ $101.65 Million
+0.99pp
2024-12-31 0.51% €451.58K
≈ $527.95K
€87.76 Million
≈ $102.60 Million
-2.28pp
2023-12-31 2.79% €2.10 Million
≈ $2.45 Million
€75.15 Million
≈ $87.86 Million
+0.13pp
2022-12-31 2.66% €2.33 Million
≈ $2.72 Million
€87.72 Million
≈ $102.55 Million
-6.68pp
2021-12-31 9.34% €1.78 Million
≈ $2.08 Million
€19.07 Million
≈ $22.29 Million
+9.19pp
2020-12-31 0.15% €13.77K
≈ $16.10K
€9.21 Million
≈ $10.77 Million
+0.13pp
2019-12-31 0.02% €1.27K
≈ $1.48K
€5.44 Million
≈ $6.36 Million
-2.53pp
2018-12-31 2.56% €82.04K
≈ $95.92K
€3.21 Million
≈ $3.75 Million
--
pp = percentage points

About Enerside Energy S.A.

MC:ENRS Spain Engineering & Construction
Market Cap
$22.84 Million
€19.54 Million EUR
Market Cap Rank
#24654 Global
#187 in Spain
Share Price
€0.45
Change (1 day)
-10.44%
52-Week Range
€0.45 - €3.08
All Time High
€6.92
About

Enerside Energy, S.A. engages in the development, construction, and maintenance of renewable energy projects. It is developing approximately 6.8 GW of solar photovoltaic generation projects in Europe and Latin America. The company was founded in 2007 and is headquartered in Barcelona, Spain.