Energoaparatura S.A. Asset Resilience Ratio

Latest as of March 2026: 14.16%

Energoaparatura S.A. asset resilience ratio. Energoaparatura S.A. (ENP) has an Asset Resilience Ratio of 14.16% as of March 2026. The Asset Resilience Ratio measures the percentage of a company's total assets that are held in liquid form (cash and short-term investments). This metric indicates how well-positioned the company is to handle unexpected financial challenges, economic downturns, or strategic opportunities without requiring external financing. Read Energoaparatura S.A. (ENP) financial obligations for a breakdown of total debt and financial obligations.

Liquid Assets

zł6.14 Million
≈ $1.69 Million USD Cash + Short-term Investments

Total Assets

zł43.39 Million
≈ $11.94 Million USD All company assets

Resilience Assessment

Moderate
Financial Resilience Level

Asset Resilience Ratio of Energoaparatura S.A. (2011–2025)

Asset resilience ratio of Energoaparatura S.A. from 2011 to 2025. This chart shows how Energoaparatura S.A.'s Asset Resilience Ratio has changed over time. See Energoaparatura S.A. (ENP) FCF generation index to measure how efficiently the company converts operating cash flow to free cash.

Liquid Assets Composition Over Time

This chart breaks down Energoaparatura S.A.'s liquid assets into cash & equivalents and short-term investments, showing how the composition has evolved over time. For the complete balance sheet picture, see Energoaparatura S.A. assets under control.

Current Liquid Assets Breakdown

Component Amount % of Total Assets
Cash & Equivalents zł0.00 0%
Short-term Investments zł6.14 Million 14.16%
Total Liquid Assets zł6.14 Million 14.16%

Asset Resilience Insights

  • Moderate Liquidity: Energoaparatura S.A. has 14.16% of assets in liquid form.
  • While adequate for normal operations, this level may limit flexibility during economic stress.
  • The company has significant short-term investments, indicating active treasury management.

Energoaparatura S.A. Industry Peers by Asset Resilience Ratio

Compare Energoaparatura S.A.'s asset resilience ratio with other companies in the same industry.

Company Industry Asset Resilience Ratio
SPIE SA
PA:SPIE
Engineering & Construction 0.04%
Bravida Holding AB
ST:BRAV
Engineering & Construction 4.08%
ChengDu Hi-Tech Development Co Ltd
SHE:000628
Engineering & Construction 3.24%
Wuhan East Lake High Technology Group Co Ltd
SHG:600133
Engineering & Construction 0.90%
Hyundai Development Co
KO:294870
Engineering & Construction 1.36%
Shanghai Urban Architecture Design Co. Ltd.
SHE:300983
Engineering & Construction 9.70%
Shenzhen Zhongzhuang Construction Group Co Ltd
SHE:002822
Engineering & Construction 2.29%
Matrix Design Co. Ltd. A
SHE:301365
Engineering & Construction 45.06%

Energoaparatura S.A. Asset Resilience Ratio by Year (2011–2025)

Energoaparatura S.A. asset resilience ratio by year from 2011 to 2025. The table below shows the annual Asset Resilience Ratio data for Energoaparatura S.A..

Year Asset Resilience Ratio (%) Liquid Assets Total Assets Change
2025-12-31 13.91% zł10.27 Million
≈ $2.83 Million
zł73.81 Million
≈ $20.31 Million
+11.71pp
2024-12-31 2.20% zł701.00K
≈ $192.93K
zł31.88 Million
≈ $8.77 Million
-0.44pp
2023-12-31 2.64% zł997.00K
≈ $274.39K
zł37.81 Million
≈ $10.41 Million
-4.05pp
2017-12-31 6.69% zł2.04 Million
≈ $562.54K
zł30.57 Million
≈ $8.41 Million
+6.67pp
2013-12-31 0.02% zł5.00K
≈ $1.38K
zł31.25 Million
≈ $8.60 Million
-1.43pp
2011-12-31 1.44% zł384.00K
≈ $105.68K
zł26.60 Million
≈ $7.32 Million
--
pp = percentage points

About Energoaparatura S.A.

WAR:ENP Poland Engineering & Construction
Market Cap
$16.25 Million
zł59.03 Million PLN
Market Cap Rank
#25608 Global
#263 in Poland
Share Price
zł3.00
Change (1 day)
+0.00%
52-Week Range
zł2.82 - zł3.86
All Time High
zł3.86
About

Energoaparatura SA provides specialized construction and assembly services in Poland. The company offers electrical power services, such as construction, repair, and modernization of HV, MV, and LV stations and distribution boards; control, measurement, and commissioning works; execution of electrical installations; construction of low-current installations; construction of the MV/HV GPO station,… Read more