MSP Steel & Power Limited Strategic Asset Allocation Index

Latest as of September 2025: 86.7%

MSP Steel & Power Limited strategic asset allocation index. MSP Steel & Power Limited (MSPL) has a Strategic Asset Allocation Index of 86.7% as of September 2025. Strategic assets (PP&E of Rs7.91 Billion plus long-term investments of Rs-) total Rs7.91 Billion, measured against net assets of Rs9.13 Billion. A higher index reflects capital-intensive or investment-heavy strategies where strategic assets dominate the equity base. See MSPL net asset quality index to measure how much of total assets are equity-financed.

SAAI

86.7%
Strategic Assets / Net Assets

Strategic Assets

Rs7.91 Billion
PP&E + LT Investments

PP&E

Rs7.91 Billion
INR

Net Assets

Rs9.13 Billion
INR

Strategic Asset Allocation Index of MSP Steel & Power Limited (2014–2025)

Strategic asset allocation index of MSP Steel & Power Limited from 2014 to 2025. This chart shows how MSP Steel & Power Limited's Strategic Asset Allocation Index has evolved across 12 annual periods from 2014 to 2025. As of September 2025, the index stands at 86.7%, representing strategic assets of Rs7.91 Billion against net assets of Rs9.13 Billion INR. Check tangible net worth ratio of MSP Steel & Power Limited to evaluate the tangible quality of the company's equity base.

MSP Steel & Power Limited Strategic Asset Allocation Index by Year (2014–2025)

MSP Steel & Power Limited strategic asset allocation index by year from 2014 to 2025. The table below presents the year-by-year Strategic Asset Allocation Index for MSP Steel & Power Limited from 2014 to 2025, covering 12 annual filings. Each row shows PP&E, long-term investments, strategic assets combined, net assets, the index percentage, and the change in percentage points compared to the prior year. For live market cap and overall valuation, see MSP Steel & Power Limited market capitalisation.

Year SAAI Strategic Assets (INR) PP&E LT Investments Net Assets Change (pp)
2025 80.8% Rs7.91 Billion Rs7.91 Billion Rs- Rs9.79 Billion ▼ -59.5 pp
2024 140.2% Rs8.17 Billion Rs8.17 Billion Rs- Rs5.83 Billion ▼ -4.7 pp
2023 145.0% Rs8.27 Billion Rs8.27 Billion Rs- Rs5.70 Billion ▲ +11.3 pp
2022 133.6% Rs8.27 Billion Rs8.27 Billion Rs- Rs6.19 Billion ▼ -10.8 pp
2021 144.4% Rs8.56 Billion Rs8.56 Billion Rs- Rs5.92 Billion ▼ -8.1 pp
2020 152.5% Rs9.07 Billion Rs9.07 Billion Rs- Rs5.94 Billion ▲ +0.3 pp
2019 152.3% Rs10.13 Billion Rs9.60 Billion Rs528.95 Million Rs6.65 Billion ▼ -3.5 pp
2018 155.8% Rs10.63 Billion Rs10.13 Billion Rs500.55 Million Rs6.83 Billion ▼ -110.1 pp
2017 265.8% Rs11.25 Billion Rs10.71 Billion Rs549.62 Million Rs4.23 Billion ▲ +50.8 pp
2016 215.0% Rs11.80 Billion Rs11.27 Billion Rs527.51 Million Rs5.49 Billion ▼ -0.3 pp
2015 215.3% Rs13.27 Billion Rs12.51 Billion Rs759.36 Million Rs6.16 Billion ▲ +48.9 pp
2014 166.5% Rs12.30 Billion Rs11.82 Billion Rs484.83 Million Rs7.39 Billion —
pp = percentage points