Techno Electric & Engineering Company Limited Strategic Asset Allocation Index
Techno Electric & Engineering Company Limited strategic asset allocation index. Techno Electric & Engineering Company Limited (TECHNOE) has a Strategic Asset Allocation Index of 14.4% as of September 2025. Strategic assets (PP&E of Rs5.60 Billion plus long-term investments of Rs-) total Rs5.60 Billion, measured against net assets of Rs38.93 Billion. A higher index reflects capital-intensive or investment-heavy strategies where strategic assets dominate the equity base. See Techno Electric & Engineering Company Li net asset quality index to measure how much of total assets are equity-financed.
SAAI
Strategic Assets
PP&E
Net Assets
Strategic Asset Allocation Index of Techno Electric & Engineering Company Limited (2015–2025)
Strategic asset allocation index of Techno Electric & Engineering Company Limited from 2015 to 2025. This chart shows how Techno Electric & Engineering Company Limited's Strategic Asset Allocation Index has evolved across 11 annual periods from 2015 to 2025. As of September 2025, the index stands at 14.4%, representing strategic assets of Rs5.60 Billion against net assets of Rs38.93 Billion INR. Check Techno Electric & Engineering Company Li tangible net worth ratio to evaluate the tangible quality of the company's equity base.
Techno Electric & Engineering Company Limited Strategic Asset Allocation Index by Year (2015–2025)
Techno Electric & Engineering Company Limited strategic asset allocation index by year from 2015 to 2025. The table below presents the year-by-year Strategic Asset Allocation Index for Techno Electric & Engineering Company Limited from 2015 to 2025, covering 11 annual filings. Each row shows PP&E, long-term investments, strategic assets combined, net assets, the index percentage, and the change in percentage points compared to the prior year. For live market cap and overall valuation, see TECHNOE company net worth.
| Year | SAAI | Strategic Assets (INR) | PP&E | LT Investments | Net Assets | Change (pp) |
|---|---|---|---|---|---|---|
| 2025 | 13.7% | Rs5.12 Billion | Rs5.12 Billion | Rs- | Rs37.40 Billion | ▼ -2.6 pp |
| 2024 | 16.3% | Rs3.52 Billion | Rs3.52 Billion | Rs- | Rs21.62 Billion | ▲ +7.2 pp |
| 2023 | 9.1% | Rs1.76 Billion | Rs1.76 Billion | Rs- | Rs19.41 Billion | ▼ -15.9 pp |
| 2022 | 24.9% | Rs4.58 Billion | Rs4.58 Billion | Rs- | Rs18.37 Billion | ▼ -3.9 pp |
| 2021 | 28.8% | Rs4.66 Billion | Rs4.66 Billion | Rs- | Rs16.16 Billion | ▼ -5.0 pp |
| 2020 | 33.9% | Rs5.07 Billion | Rs5.07 Billion | Rs- | Rs14.97 Billion | ▼ -11.8 pp |
| 2019 | 45.6% | Rs6.51 Billion | Rs5.45 Billion | Rs1.06 Billion | Rs14.26 Billion | ▼ -9.3 pp |
| 2018 | 55.0% | Rs6.77 Billion | Rs5.84 Billion | Rs925.61 Million | Rs12.32 Billion | ▼ -1.8 pp |
| 2017 | 56.7% | Rs6.28 Billion | Rs6.16 Billion | Rs117.91 Million | Rs11.07 Billion | ▼ -28.7 pp |
| 2016 | 85.4% | Rs8.67 Billion | Rs8.03 Billion | Rs634.49 Million | Rs10.14 Billion | ▼ -26.5 pp |
| 2015 | 112.0% | Rs10.46 Billion | Rs10.08 Billion | Rs379.72 Million | Rs9.35 Billion | — |