Hung Sheng Construction Ltd (2534) — Long-term Investment Intensity

Latest as of September 2019: 1.8%

Hung Sheng Construction Ltd (2534) has a Long-term Investment Intensity of 1.8% as of September 2019. Long-term investments of NT$533.75 Million represent 1.8% of total assets of NT$30.09 Billion. A higher ratio indicates a company with significant capital committed to long-duration strategic positions. Check Hung Sheng Construction Ltd (2534) asset resilience to evaluate the company's liquid asset resilience ratio.

LT Investment Intensity

1.8%
LT Investments / Total Assets

Long-term Investments

NT$533.75 Million
TWD

Total Assets

NT$30.09 Billion
TWD

Country

Taiwan
TW

Hung Sheng Construction Ltd Long-term Investment Intensity (2013–2018)

This chart shows how Hung Sheng Construction Ltd's Long-term Investment Intensity has evolved across 6 annual periods from 2013 to 2018. As of September 2019, the intensity stands at 1.8%, reflecting long-term investments of NT$533.75 Million against total assets of NT$30.09 Billion TWD. For the complete balance sheet picture, see Hung Sheng Construction Ltd (2534) total assets.

Annual Long-term Investment Intensity for Hung Sheng Construction Ltd (2013–2018)

The table below presents the year-by-year Long-term Investment Intensity for Hung Sheng Construction Ltd from 2013 to 2018, covering 6 annual filings. Each row shows total assets, long-term investments, the intensity percentage, and the change in percentage points compared to the prior year. Read Hung Sheng Construction Ltd total liabilities for a breakdown of total debt and financial obligations.

Year LT Investment Intensity LT Investments (TWD) Total Assets Change (pp)
2018 1.6% NT$511.09 Million NT$31.27 Billion ▲ +1.4 pp
2017 0.2% NT$79.43 Million NT$32.03 Billion ▼ -0.3 pp
2016 0.6% NT$172.20 Million NT$29.78 Billion ▼ -0.1 pp
2015 0.6% NT$170.87 Million NT$27.05 Billion ▼ -0.2 pp
2014 0.8% NT$199.09 Million NT$25.00 Billion ▼ -0.1 pp
2013 0.9% NT$202.70 Million NT$23.68 Billion
pp = percentage points